Produktübersicht

Gravity Skate Wheel Conveyor user manual

This Gravity Skate Wheel Conveyor user manual includes equipment structure descriptions, installation guidance, operating procedures, maintenance, and troubleshooting. It is suitable for logistics warehousing and loading/unloading operations and helps users operate skate wheel conveying equipment correctly.

Gravity Skate Wheel Conveyor user manual
Veröffentlichungsdatum: 2026-03-23

I. Installation Instructions

Application notes: as stated in the original text,38 non-powered,50 non-powered und Furai wheel have the same installation steps.

Installation steps

1. Align the two Furai wheels

  • First, align the two Furai wheels.

  • Align the two skate wheel conveyors
    Align the two skate wheel conveyors

2. Install the upper support plate

  • Remove the anti-slip nuts from both ends.

  • After installing the upper support plate, re-tighten the nuts.

  • Unscrew the two nuts at the connection of the two conveyors and install the upper support plate.
    Unscrew the two nuts at the connection of the two conveyors and install the upper support plate.

3. Install the upper and lower support plates

  • Repeat the previous step to remove the nuts from both ends again.

  • Install the upper and lower support plates.

  • On the other side, also unscrew the two nuts at the conveyor connection and install the upper support plate.
    On the other side, also unscrew the two nuts at the conveyor connection and install the upper support plate.

4. Tighten the nuts

  • Use both sides simultaneously 13 wrench to tighten the nuts.

  • Tighten the nuts on both ends simultaneously
    Tighten the nuts on both ends simultaneously

5. Install the bracket

  • After aligning the bracket, insert it into the upper and lower supports.

  • Insert the leg frame into the upper and lower support sleeves.
    Insert the leg frame into the upper and lower support sleeves.

6. Tighten the hex socket screws

  • Install 10 hex socket screw and tighten.

  • Tighten the leg frame
    Tighten the leg frame

7. Adjust the leg frame height

  • Loosen the T-handle screw to adjust the leg height.

  • Loosening the hand screw allows leg height adjustment
    Loosening the hand screw allows leg height adjustment

8. Install the handrail

  • The handrail can be installed at the head or tail.

  • Handrail of the skate wheel conveyor
    Handrail of the skate wheel conveyor

II. Usage Notes

1. Avoid dropping goods from height during loading and unloading

  • When unloading, do not drop goods directly from a high place.

  • This will shorten the machine’s service life.

2. Avoid collisions during storage and movement

  • Handle the machine carefully when storing or moving it.

  • So that telescoping rails and other parts are not damaged.

3. Pay attention to the storage environment

  • The equipment should be kept away from the following environments:

    • Areas with chemical gases

    • Areas with corrosive gases

    • Humid environments

    • Places with standing water or prone to contact with water

  • These conditions can damage machine parts and reduce the equipment’s lifespan.

4. Inspect for transportation damage after receipt

  • After receiving the goods, please check whether any damage occurred during logistics transport.

  • If you find any damage, notify us promptly.

Kontakt zum Vertriebsleiter

Ansprechpartner: Herr Chen (David Deng)Vertriebsleiter

WeChat
18025268488
WhatsApp
+86 18025268488
Telefon
+86 18025268488
E-Mail
david.deng@nailiequipment.com
Markenname
Naili-Förderband | Naili-Entladung
Firmenname
Guangdong NAILI Logistics Special Equipment Manufacturing CO., LTD. (Guangdong NAILI Logistics Special Equipment Manufacturing CO., LTD.)

Werksstärke

Erfahren Sie anhand von echten Fotos und Videos mehr über die Produktionsanlagen, die Werkstattumgebung, die Verarbeitungskapazität und die Qualitätskontrolle.

工厂图片 1
Bild

Bild 1 aus der Fabrik

工厂主图
Bild

Hauptbild der Fabrik

工厂图片 3
Bild

Fabrikbild 3

工厂图片 2
Bild

Fabrikbild 2

工厂图片 4
Bild

Bilder aus der Fabrik 4